代码 700112: Pm not done
问题描述与安全警告
Chiron Siemens-Control CNC 触发了严重的 Pm not done 警报。需要由合格的操作员或维修技师立即处理,以防止在制造周期中对设备造成二次损坏或导致零件报废。在接触电气控制箱之前,请务必确保遵循标准安全和停机挂牌 (LOTO) 程序。
官方故障排除步骤
Maintenance has not been carried out, despite several indications. The machine urgently requires maintenance. In the diagnostics menu Maintenance cycles, it is shown what maintenance is required. The error message is displayed immediately, but the machining program still continues until the program end. Further operation of the machine remains blocked. Optional: The red signal indicator flashes (1 Hz), and the white signal indicator continues to flash continuously. (Cycle: ON = 0.4 sec / pause = 2 sec) These displays remain visible until the completion of maintenance is acknowledged. Error messages Maintenance Pm not done 1. In the diagnostics menu Maintenance cycles, check which maintenance is required. The "hours display" of the pending maintenance cycle is shown inverted. 2. Further use of the machine is not possible if the required maintenance is not carried out and acknowledged now. The procedure for maintenance acknowledgement is explained in chapter: Confirm maintenance. 3. After confirming the maintenance, press the following key: [FEED START] Message is cleared. The menu can be found under: Chapter 2.7 ‘Maintenance cycles’ on page 12
Source: CHIRON Error Message Overview, all series (Siemens control, V2.0.6, 2012)
Last reviewed: 2026-07-01 · Verified against the manufacturer’s official documentation.
关于 Chiron Siemens-Control CNC 警报
由 Chiron 制造的工业控制器具有广泛的诊断系统,用于保护内部电路和机械连杆。当 Siemens-Control CNC 出现类似 700112 的错误代码时,通常表示指令值与实际传感器反馈之间存在不匹配。
完整报警清单: 545 Chiron Siemens-Control CNC 代码s.
Have a better solution?
Help the industrial community by sharing your repair experience for code 700112.
Need a searchable reference for more Chiron Siemens-Control CNC manuals?
We structure equipment manuals into searchable code, title, cause, solution, safety note, and source-reference data. Send a PDF and example searched codes when you need public pages, private search, or structured exports.
Space reserved for Google AdSense / Industrial Affiliate Links
Monetization target for 2026